CONSTRUCTION   1

Click on picture to enlarge

ourlotsept24.JPG (83730 bytes)

Lot at start


lotoct14.jpg (67127 bytes)

Foundation dug


Copy of lotday2footersreadytopour.jpg (56185 bytes)

Footer forms in


Copy_of_lotfooterspoured.jpg (61563 bytes)

Footers poured


lotfoundationpoured.jpg (58158 bytes)

Foundation forms up


Copy_of_lottemppoleup.jpg (54485 bytes)

Electric temp pole up


lotday2watertapin.jpg (59171 bytes)

Water tap in


lotday2waterlinein.jpg (56961 bytes)

Water line in


lotfoundationwallsformsoff.jpg (58527 bytes)

Foundation poured


lotputtinginperimeterinsulation.jpg (38021 bytes)

Insulation being installed


lotroughgradedfullybackfilled.jpg (61182 bytes)

Foundation fully backfilled


lotleachmoundfinished.jpg (54599 bytes)

Septic mound finished


Copy of lotundrgrndplumbingin.jpg (64667 bytes)

Underground plumbing in


lottubingcloseup.jpg (117575 bytes)

Radiant floor tubing in


lotslabpoured.jpg (62475 bytes)

Slab poured


lotframingcloseupone.jpg (50182 bytes)

Framing begun


lothousesheathed.jpg (21310 bytes)

House sheathed


lotraftersgoingup.jpg (68018 bytes)

Roof rafters going up


lothousedec19.jpg (27343 bytes)

Main house framed and sheathed


Copy of lothousejan9.jpg (30757 bytes)

Porch framed


lothousejan9.jpg (30757 bytes)

House insulated


lothousejan14front.jpg (30954 bytes)

Purlins on walls


lothousejan20.jpg (42058 bytes)

Windows and doors installed


lothousefeb7.jpg (26432 bytes)

Siding finished and roofing started


 
And finally -- outside finished!

 